Synopsis : While Delhi Metro’s Phase I and II laid the foundation of a robust mass rapid transit system, Phase III made the metro accessible to major localities of Delhi. But it was also the toughest in terms of major civil engineering challenges it encountered. The 160 km-long stretch saw work on 11 different corridors with 30 mammoth tunnel boring machines and a workforce of nearly 30,000. This film highlights how DMRC overcame such engineering challenges with out of the box solutions.
Director :
Satish Pande
Producer :
Anuj Dayal
Screenplay :
Ahad Umar Khan
DOP :
Rajan Kumar Shrivastav
Editor :
Pawan Kumar